By Austen Ebenger, owner of Southern Pool Designs. Last updated November 2026.
A pool design that ignores code gets paid for twice: once to draw it, and again to fix it at permit review or during construction. Florida’s rules on setbacks, barriers, exits, drains and electrical clearances are not hard to meet when they are part of the design from the start. They are expensive when they are discovered after you have fallen in love with the renders.
Planning a pool? Book a complimentary Site Assessment.

Where Designs Go Wrong
| Missed in design | What it costs later |
|---|---|
| Pool, deck or enclosure crosses a setback or easement | Redesign, smaller pool or a variance request |
| No plan for the pool barrier or house-side protection | A fence through the view or door hardware added at the end |
| Deep area over 5 feet with no required exit | A ladder in your photos, or rework of the shell |
| Equipment pad in an easement, too close to the pool or next to the barrier | Relocation, longer pipe runs and higher running cost |
| Fans, TVs or outlets placed without electrical clearances | Moved fixtures and a redesigned cabana |
| Features designed before engineering or soil review | Change orders for steel, structure or dewatering |
The Real Cost Is Time and Trust
Each fix means redesign hours, a resubmitted permit, schedule slips and, often, a change order. Worse, the pool you approved is not quite the pool you get. That is the gap between a design and a buildable design.
What a Code-Checked Design Looks Like
- It starts from your survey, zoning setbacks, easements and HOA rules.
- The barrier method, gates and house-side protection are drawn in.
- Steps, benches and exits are dimensioned to the code.
- The equipment pad and electrical layout are placed and cleared.
- It is engineered and priced before you commit to build.
We cover more ways projects get delayed in 7 mistakes that delay high-end pool builds.
How We Do It
Because the team that designs your pool also engineers, permits and builds it, our designs are checked against Florida code from the first sketch. Every design book from our Design Studio comes with a fixed construction price, and the code questions are already answered. Want to see it for your yard? Book a complimentary Site Assessment.
This article is general information. Southern Pool Designs confirms requirements with the building department on every permit.
Frequently Asked Questions
Can I hire a designer and a builder separately?
Yes, but the builder still has to check the design against Florida code, engineer it and price it. Anything the design missed gets fixed at that stage, on your time and budget.
What design mistakes most often fail permit review?
Common problems include encroaching on setbacks or easements, missing barrier or door protection, an equipment pad in the wrong spot, and deep areas without a required exit.
How do I know if a design is code-checked?
Ask the designer to show how the design meets setbacks, easements, barrier rules, entry and exit requirements and electrical clearances, and who will engineer and permit it.
What does it cost to fix a design late?
It varies, but late fixes usually mean redesign time, a resubmitted permit, schedule delays and change orders. The same fix during design costs very little.